/ News & Press / Video / How to Install a Combination Boiler Baxi Gas Combi Boiler Installation
How to Install a Combination Boiler Baxi Gas Combi Boiler Installation
WEBVTT Kind: captions Language: en
00:00:01.429 --> 00:00:06.810 My name is Allen Hart and today we're working in Otley near Leeds and we'll 00:00:06.810 --> 00:00:12.269 just install a new combi boiler so we've got a nice flat wall here today so we're 00:00:12.269 --> 00:00:20.910 just gonna show you step by step how we do it so the first thing and one of the 00:00:20.910 --> 00:00:28.560 most important things we protect the property we've got a bucket Platinum 00:00:28.560 --> 00:00:33.470 there so that's the boiler that what is Darwin today 00:00:48.480 --> 00:00:57.059 and then when we open this just finds back with all the useful things ooh I 00:00:57.059 --> 00:01:10.000 love your fitness pack on this just slides out so if we see that all the 00:01:10.000 --> 00:01:14.380 Bible is still in the box so the pilot can be just kept nice and safe 00:01:14.380 --> 00:01:21.850 well we fit the jig oh and then just mark all this out so there's a level 00:01:21.850 --> 00:01:27.580 here so we can easily level the pilot Rob so one thing to point out with this 00:01:27.580 --> 00:01:33.490 it must be installed by gas a registered engineer if it's not installed by gas a 00:01:33.490 --> 00:01:38.200 registered engineer then you will have no warrants with the boiler and you will 00:01:38.200 --> 00:01:42.580 also if you come to sell your property you will have that the right 00:01:42.580 --> 00:01:47.200 certification that you'll need to actually sell the property so always 00:01:47.200 --> 00:01:52.319 make sure that you have it done by gas therefore interested engineer 00:02:04.080 --> 00:02:07.510 so we have up to our car drill move us to there 00:02:07.510 --> 00:02:14.730 so what we'll do is we'll just stitch that so we drilled a load of six mill 00:02:14.730 --> 00:02:23.490 pilot bits all around on a flow so it's nice and Nate is out 00:03:00.640 --> 00:03:07.190 so I've put the straps back on the box and left the farm stuff in the bottom 00:03:07.190 --> 00:03:17.060 and now to use that has been key pop rice together so I've just got scaps to 00:03:17.060 --> 00:03:32.540 take out the bottle here but what without these are tested before the come 00:03:32.540 --> 00:03:39.590 out so you should never have a fault fault it won't come install because I've 00:03:39.590 --> 00:03:54.490 all been tested and now we're just going to come off just don't get bent 00:04:11.400 --> 00:04:19.540 so what we normally find is these notes on this boxer dog by not very well so 00:04:19.540 --> 00:04:35.500 you can't just tie them off in my mind so all you need to do is see the nuts on 00:04:35.500 --> 00:04:41.860 the back just slack on them nuts off and then you'll be able to connect it up 00:04:41.860 --> 00:05:23.139 very easily on the back of the vowel so if you collected all their mum now so 00:05:23.139 --> 00:05:27.760 now we can just nip them all off and then just take them back knocks back up 00:05:27.760 --> 00:05:33.910 I will I always do this first before I connected it back to it because if we 00:05:33.910 --> 00:05:38.650 connect the pipes to it it can be quite awkward to get them to line up so this 00:05:38.650 --> 00:05:43.950 is just the way I do it so just connected the pressure-relief 00:05:43.950 --> 00:05:53.320 pipe if you see there he's bent so these always come twisted I'll Bend on the on 00:05:53.320 --> 00:05:57.970 the back see boilers and so you can if you want there's a little grub screw 00:05:57.970 --> 00:06:04.210 there you can just undo that and you can straighten it up a little bit or you can 00:06:04.210 --> 00:06:07.660 just try and Bend this pipe a little bit all the things I've seen I've seen 00:06:07.660 --> 00:06:14.020 people cut this and then just pull sake I'm just destroying it up by the one so 00:06:14.020 --> 00:06:19.900 I've actually just twisted the pipe a little bit so I've just drilled for the 00:06:19.900 --> 00:06:24.260 blow-off now and we'll just slave that and we're just 00:06:24.260 --> 00:06:30.730 gonna put some non saying mistake in that we do on the carpets can we contact 00:06:30.730 --> 00:06:40.190 with the cement because the cement will corrode the copper over time so we just 00:06:40.190 --> 00:06:43.520 don't work pipes now so cause perhaps fault sir 00:06:43.520 --> 00:06:50.210 but is that there's Phenix I mean you fill its up and then we're 00:06:50.210 --> 00:07:03.770 just going to do a gas now so we've got a pilot from running now so we're just 00:07:03.770 --> 00:07:10.180 gonna check the emissions we just got scared and I do that 00:07:13.880 --> 00:07:20.490 we've also got pushing it after on that 00:07:20.490 --> 00:07:27.020 hostile shit system along the cleanse 00:07:30.190 --> 00:07:35.590 so we just finished enough now so I've installed this box this box it platinum 00:07:35.590 --> 00:07:41.210 so this box of platinum cause of a ten year parts and labor warranty we've also 00:07:41.210 --> 00:07:46.790 got we've installed the FIR Knox filter so the phonon filter come from a 25 year 00:07:46.790 --> 00:07:54.040 warranty and we've also put we've cleaned it out with fir Knox f5 and 00:07:54.040 --> 00:08:01.700 we've also added fir Knox inhibitor f1 protector in afterwards so that I'll 00:08:01.700 --> 00:08:08.240 protect the system thank you for taking the time to watch our video helpful 00:08:08.240 --> 00:08:11.980 install a combi boiler
Office location
Engineering company LOTUS®
Russia, Ekaterinburg, Lunacharskogo street, 240/12