CHP unit with 4-pass boiler - Efficient system solution for the Traunstein Hospital

WEBVTT
Kind: captions
Language: en

00:00:00.650
the university clinic of the Ludwig
00:00:03.739 00:00:03.749 Maximilian University Munich provides
00:00:06.260 00:00:06.270 medical care for the city of town Stein
00:00:08.540 00:00:08.550 and the southern part of the Khimki
00:00:10.669 00:00:10.679 region with over 500 beds various day
00:00:14.180 00:00:14.190 clinics and several competent centers it
00:00:16.490 00:00:16.500 has a complex energy demand therefore a
00:00:20.060 00:00:20.070 highly efficient system from Bosch was
00:00:22.429 00:00:22.439 selected for the expansion of the
00:00:24.380 00:00:24.390 central energy generation this steam
00:00:27.589 00:00:27.599 supply at the town Stein hospital
00:00:29.689 00:00:29.699 comprises two steam boilers from Bosch
00:00:31.910 00:00:31.920 produced in the Gunson housing plant in
00:00:34.460 00:00:34.470 the region of Franconia for more than
00:00:37.250 00:00:37.260 150 years this plant has been
00:00:39.710 00:00:39.720 manufacturing industrial boiler systems
00:00:42.260 00:00:42.270 for customers in over 140 countries
00:00:44.780 00:00:44.790 around the world
00:00:45.950 00:00:45.960 the intelligently controlled system
00:00:48.380 00:00:48.390 offers the high reliability and
00:00:50.150 00:00:50.160 efficiency needed in a modern hospital
00:00:52.960 00:00:52.970 thanks to the dual fuel burners two of
00:00:55.940 00:00:55.950 the boilers can also be operated with
00:00:58.280 00:00:58.290 light fuel oil in case of gas supply
00:01:00.740 00:01:00.750 shortage to lower electricity costs and
00:01:05.420 00:01:05.430 emissions a combined heat and power unit
00:01:08.180 00:01:08.190 from Bosch was implemented to assist
00:01:10.550 00:01:10.560 with heating and hot water supply the
00:01:13.400 00:01:13.410 locally produced electricity generates
00:01:15.680 00:01:15.690 only half as much co2 and is cheaper
00:01:18.470 00:01:18.480 than electricity from the German grid
00:01:20.360 00:01:20.370 this CHP unit was produced and tested at
00:01:23.780 00:01:23.790 the Bosch plant in Lola
00:01:34.350 00:01:34.360 the installation of the CHP and the
00:01:37.660 00:01:37.670 three boilers was challenging as they
00:01:39.940 00:01:39.950 had to be moved into the basement of the
00:01:42.040 00:01:42.050 hospital through a narrow shaft the
00:01:45.070 00:01:45.080 complete setup was handled by the Alma
00:01:47.230 00:01:47.240 tech company in zulu while the bosch
00:01:49.510 00:01:49.520 industrial service took care of the
00:01:51.910 00:01:51.920 commissioning
00:01:57.990 00:01:58.000 the intelligent system controls from
00:02:00.990 00:02:01.000 Bosch coordinate the operation of the
00:02:03.390 00:02:03.400 various energy generators effectively
00:02:05.940 00:02:05.950 this reduces operating costs while
00:02:08.639 00:02:08.649 simultaneously protecting the
00:02:10.710 00:02:10.720 environment a special highlight of the
00:02:13.740 00:02:13.750 system is that the hot flue gases from
00:02:15.930 00:02:15.940 the CHP unit pass through one of the
00:02:18.210 00:02:18.220 steam boilers thus the waste heat
00:02:20.580 00:02:20.590 supports the steam production and
00:02:22.350 00:02:22.360 increases the total efficiency of the
00:02:24.690 00:02:24.700 system
00:02:30.640 00:02:30.650 in the winter the heat from the heating
00:02:33.429 00:02:33.439 boilers is needed to keep the helicopter
00:02:35.679 00:02:35.689 landing pad free of ice and snow
00:02:38.170 00:02:38.180 in addition the boilers supply the
00:02:40.809 00:02:40.819 hospital building as well as the patient
00:02:43.179 00:02:43.189 rooms with heat and hot water
00:02:45.490 00:02:45.500 this central sterilization area is the
00:02:48.160 00:02:48.170 main consumer of steam together with the
00:02:50.979 00:02:50.989 operating rooms the town Stein hospital
00:02:54.670 00:02:54.680 with highly efficient environmentally
00:02:56.830 00:02:56.840 friendly energy supply from Bosch
Office location
Engineering company LOTUS®
Russia, Ekaterinburg, Lunacharskogo street, 240/12

Phone: +7 343 216 77 75

E-mail: info@lotus1.ru

Sales phone

Russia: +7 343 216 77 75

WhatsApp: +79122710308