this video demonstrates how to configure
00:00:02.180 00:00:02.190 the cooling water set up for the pack
00:00:03.560 00:00:03.570 column with respect to the custom
00:00:05.059 00:00:05.069 separations technology distillation
00:00:06.829 00:00:06.839 plant and the union's laboratory at
00:00:08.629 00:00:08.639 Lafayette College the valves that
00:00:10.430 00:00:10.440 operate the cooling water are located on
00:00:12.020 00:00:12.030 the back panel the structure before the
00:00:14.900 00:00:14.910 cooling water is turned on the system
00:00:16.250 00:00:16.260 must be drained from the previous
00:00:17.420 00:00:17.430 operation on the back side of the right
00:00:19.310 00:00:19.320 panel open bv 125 and collect the dirty
00:00:21.859 00:00:21.869 water in an appropriate collection
00:00:23.480 00:00:23.490 container with bv 125 still open
00:00:26.390 00:00:26.400 throttle bv 203 the cooling water inlet
00:00:29.120 00:00:29.130 three times it does not need to be open
00:00:31.550 00:00:31.560 all the way closed bv 125 and empty the
00:00:34.850 00:00:34.860 container into the drain behind the
00:00:36.200 00:00:36.210 kettle reboiler ensure that bv 125 is
00:00:39.950 00:00:39.960 closed before opening bv 203 once the
00:00:42.920 00:00:42.930 cooling water supply is completely open
00:00:44.389 00:00:44.399 p I 114 should read between 40 and 60
00:00:47.150 00:00:47.160 psi P I 114 is located on the back side
00:00:50.360 00:00:50.370 of the panel on the back panel adjust bv
00:00:53.660 00:00:53.670 121 and bv 122 to a counter-current or
00:00:56.660 00:00:56.670 co-current flow configuration for the
00:00:58.520 00:00:58.530 column condensers
00:01:01.180 00:01:01.190 open bv1 19 which sends cooling water to
00:01:04.340 00:01:04.350 the distillate product heat exchanger x
00:01:06.080 00:01:06.090 106 open bv 116 and bv 111 to utilize
00:01:10.399 00:01:10.409 the vertical condenser open bv 117 and
00:01:14.120 00:01:14.130 bv 112 to utilize the horizontal
00:01:16.160 00:01:16.170 condenser ensure that bv 118 120 113 114
00:01:22.010 00:01:22.020 and 115 are all closed
00:01:25.100 00:01:25.110 to learn more about the operation of the
00:01:27.290 00:01:27.300 distillation plant watch the related
00:01:28.940 00:01:28.950 videos on the Lafayette chbe YouTube
00:01:31.460 00:01:31.470 channel
Office location
Engineering company LOTUS®
Russia, Ekaterinburg, Lunacharskogo street, 240/12

Phone: +7 343 216 77 75

E-mail: info@lotus1.ru

Sales phone

Russia: +7 343 216 77 75

WhatsApp: +79122710308