this video demonstrates how to configure
00:00:02.690 00:00:02.700 the cooling water set up for the tray
00:00:04.220 00:00:04.230 column with respect to the custom
00:00:05.660 00:00:05.670 separations technology distillation
00:00:07.460 00:00:07.470 plant and the unit operations laboratory
00:00:09.259 00:00:09.269 at Lafayette College the vowels that
00:00:11.629 00:00:11.639 operate the cooling water are located on
00:00:13.190 00:00:13.200 the right panel of the structure before
00:00:15.169 00:00:15.179 the cooling water is turned on the
00:00:16.760 00:00:16.770 system must be drained from the previous
00:00:18.290 00:00:18.300 operation on the back side of the right
00:00:20.150 00:00:20.160 panel open bv 125 and collect the dirty
00:00:23.060 00:00:23.070 water in an appropriate collection
00:00:24.500 00:00:24.510 container with bv 125 still open
00:00:27.439 00:00:27.449 throttle bv 203 the cooling water inlet
00:00:30.349 00:00:30.359 three times it does not need to be open
00:00:32.690 00:00:32.700 all the way closed bv 125 and empty the
00:00:35.810 00:00:35.820 container into the drain behind the
00:00:37.370 00:00:37.380 kettle reboiler ensure that bv 125 is
00:00:40.700 00:00:40.710 closed before opening bv 203 once the
00:00:44.060 00:00:44.070 cooling water supply is completely open
00:00:45.590 00:00:45.600 p I 114 should read between 40 and 60
00:00:48.590 00:00:48.600 psi P I 114 is located on the back side
00:00:52.220 00:00:52.230 of the right panel on the right panel
00:00:56.090 00:00:56.100 adjust bv 101 and bv 102 a
00:00:59.869 00:00:59.879 counter-current or co-current flow
00:01:01.549 00:01:01.559 configuration for the vertical or
00:01:03.889 00:01:03.899 horizontal column condensers on the back
00:01:06.410 00:01:06.420 panel turn bv 122 to the counter current
00:01:08.960 00:01:08.970 position and open bv 120 which sends
00:01:11.450 00:01:11.460 cooling water to the distillate product
00:01:13.100 00:01:13.110 heat exchanger hex 108 on the right
00:01:16.670 00:01:16.680 panel open bv 105 and be v1 02 to
00:01:19.940 00:01:19.950 utilize the vertical condenser open bv
00:01:22.760 00:01:22.770 106 and bv 103 to utilize the horizontal
00:01:26.210 00:01:26.220 condenser ensure that bv 107 and bv 104
00:01:30.050 00:01:30.060 are closed to learn more about the
00:01:32.569 00:01:32.579 operation of the distillation plant
00:01:34.069 00:01:34.079 watch the related videos on the
00:01:35.660 00:01:35.670 Lafayette chbe YouTube channel
Office location
Engineering company LOTUS®
Russia, Ekaterinburg, Lunacharskogo street, 240/12

Phone: +7 343 216 77 75

E-mail: info@lotus1.ru

Sales phone

Russia: +7 343 216 77 75

WhatsApp: +79122710308