[Music]
00:00:05.030 00:00:05.040 what's going on everybody
00:00:07.050 00:00:07.060 I'm gold gasps this episode we're going
00:00:09.299 00:00:09.309 back to basics we're going to look
00:00:10.919 00:00:10.929 inside some gas boilers I'm going to
00:00:13.110 00:00:13.120 give you the names of the parts and also
00:00:15.659 00:00:15.669 going to look at the ignition sequences
00:00:17.310 00:00:17.320 as well if you enjoy a drop a like don't
00:00:20.460 00:00:20.470 forget to subscribe
00:00:21.810 00:00:21.820 push that Bell notification button as
00:00:23.970 00:00:23.980 well if you don't do that you might miss
00:00:26.009 00:00:26.019 out on some new videos that drop maybe
00:00:29.160 00:00:29.170 some new promotions and new competitions
00:00:31.529 00:00:31.539 so it's worth doing another video I'm
00:00:34.619 00:00:34.629 gonna show you some parts and give you
00:00:36.090 00:00:36.100 their names the middle going to look at
00:00:39.389 00:00:39.399 some ignition sequences the screenshots
00:00:41.549 00:00:41.559 and the manuals and some full finding
00:00:43.860 00:00:43.870 flowcharts and the end of the video
00:00:46.650 00:00:46.660 we're going to look at some boilers
00:00:48.569 00:00:48.579 inside so you can actually see the parts
00:00:50.369 00:00:50.379 and where they're located and what they
00:00:52.439 00:00:52.449 look like in the boiler this video is
00:00:55.920 00:00:55.930 aimed at trainees or apprentices just
00:00:58.470 00:00:58.480 beginning to work on gas boilers or want
00:01:00.840 00:01:00.850 to know more about gas boilers it's just
00:01:03.660 00:01:03.670 a guide check your manuals for the
00:01:06.630 00:01:06.640 specific boilers you're working on
00:01:08.340 00:01:08.350 because every boiler is unique and don't
00:01:12.990 00:01:13.000 open up the casing of a gas boiler or
00:01:16.050 00:01:16.060 work on a gas boiler unless you are with
00:01:19.320 00:01:19.330 someone who is gas qualified
00:01:24.220 00:01:24.230 this is the control board or PCB printed
00:01:28.160 00:01:28.170 circuit board
00:01:33.870 00:01:33.880 central heating or circulating pump
00:01:39.340 00:01:39.350 fan assembly is an old style and the new
00:01:42.730 00:01:42.740 style with control board attached to
00:01:44.740 00:01:44.750 modulate
00:01:48.000 00:01:48.010 ApS or air pressure switch
00:01:53.830 00:01:53.840 gas valve
00:01:58.819 00:01:58.829 overheat stat
00:02:05.800 00:02:05.810 you
00:02:09.320 00:02:09.330 Pilate and Pilate injector
00:02:13.660 00:02:13.670 spark generator there's a push-button
00:02:16.729 00:02:16.739 one here that can also be called a piezo
00:02:19.910 00:02:19.920 igniter
00:02:23.660 00:02:23.670 thermocouple found on the older boilers
00:02:28.449 00:02:28.459 electrodes there is a flame sensing one
00:02:31.760 00:02:31.770 and also an ignition one
00:02:38.320 00:02:38.330 water pressure switch or sensor or WPS
00:02:44.550 00:02:44.560 sensors for misters NTC sensor the
00:02:50.710 00:02:50.720 misters and sensors you have one for the
00:02:53.560 00:02:53.570 hot water
00:02:54.490 00:02:54.500 central heating flying return because I
00:02:56.920 00:02:56.930 have clamp on style flu sensor so you
00:03:00.850 00:03:00.860 need to have a little read up also
00:03:02.470 00:03:02.480 different colors from different
00:03:03.910 00:03:03.920 manufacturers
00:03:06.250 00:03:06.260 hot water flow switch or paddle switch
00:03:10.830 00:03:10.840 domestic hot water heat exchanger or
00:03:13.839 00:03:13.849 plate heat exchanger or plate to plate
00:03:19.320 00:03:19.330 expansion vessel
00:03:28.210 00:03:28.220 pressure release valve or safety valve
00:03:34.820 00:03:34.830 there is a mid-position valve or three
00:03:37.820 00:03:37.830 port valve
00:03:45.420 00:03:45.430 zone valve or two-port
00:03:54.970 00:03:54.980 00:04:03.320 00:04:03.330 is the burner assembly in the burner arm
00:04:05.720 00:04:05.730 I'm going to show you some insides of
00:04:07.610 00:04:07.620 the heat exchangers as well
00:04:15.960 00:04:15.970 00:04:21.330 00:04:21.340 here's some exploded diagrams of the
00:04:23.580 00:04:23.590 boilers
00:04:25.790 00:04:25.800 I will now give you a brief ignition
00:04:28.430 00:04:28.440 sequence but check your manuals for the
00:04:31.490 00:04:31.500 specific ones for your boiler ignition
00:04:36.290 00:04:36.300 sequences there in all the manuals so if
00:04:39.140 00:04:39.150 in doubt check your M eyes you have your
00:04:42.379 00:04:42.389 demand for central heating or if you run
00:04:45.170 00:04:45.180 the hot tap the boiler will start the
00:04:48.379 00:04:48.389 fan will run the pump will run once the
00:04:50.869 00:04:50.879 fan has been proved to run also
00:04:52.909 00:04:52.919 sometimes there are pump for proving
00:04:54.439 00:04:54.449 switches as well the ignition sequence
00:04:56.899 00:04:56.909 will start
00:05:00.820 00:05:00.830 the sparkle
00:05:02.690 00:05:02.700 begin to spark it we'll try this for a
00:05:05.030 00:05:05.040 few attempts if the flame sensing
00:05:07.490 00:05:07.500 electrode doesn't get a flame sensed
00:05:09.650 00:05:09.660 then it will end and go to a full code
00:05:13.520 00:05:13.530 or lockout if the burner does light and
00:05:16.850 00:05:16.860 the flame sensor has sensed the flame
00:05:19.790 00:05:19.800 I've send the signal back to the board
00:05:21.410 00:05:21.420 the gas valve will stay open and
00:05:23.120 00:05:23.130 everything will continue to run until
00:05:25.450 00:05:25.460 your demand has been turned off or the
00:05:28.850 00:05:28.860 hot water is off
00:05:34.379 00:05:34.389 when the boiler starts up it will also
00:05:37.260 00:05:37.270 check the safety devices make sure the
00:05:39.990 00:05:40.000 overheats that hasn't tripped make sure
00:05:42.330 00:05:42.340 the pressure sensor is working correctly
00:05:45.270 00:05:45.280 or is not over pressurized under
00:05:47.100 00:05:47.110 pressurized so all the safety devices
00:05:49.290 00:05:49.300 are checked and it may or may not
00:05:51.809 00:05:51.819 operate depending if they have tripped
00:05:53.760 00:05:53.770 or not
00:05:56.930 00:05:56.940 is some of the stats and the senses that
00:05:59.999 00:06:00.009 are mentioned before flow switches well
00:06:03.540 00:06:03.550 flow sensor water pressure switch
00:06:14.700 00:06:14.710 or the flu stars well electrode
00:06:25.360 00:06:25.370 00:06:42.090 00:06:42.100 so we have our central heat in demand
00:06:44.580 00:06:44.590 that then sends a signal to the board
00:06:47.340 00:06:47.350 the board sends a signal to the pump and
00:06:50.580 00:06:50.590 the fan as soon as they are proved to be
00:06:52.920 00:06:52.930 running that sends a signal back to the
00:06:54.870 00:06:54.880 board which sends a signal to the gas
00:06:56.940 00:06:56.950 valve which then opens sends gas into
00:07:00.270 00:07:00.280 the burner that begins to spark from the
00:07:02.490 00:07:02.500 electrode which also sent from the PCB
00:07:04.590 00:07:04.600 as well and the ignition sequence has
00:07:07.410 00:07:07.420 started
00:07:16.310 00:07:16.320 so your hot tap is opened the flow
00:07:19.740 00:07:19.750 sensor senses the water being passed
00:07:22.350 00:07:22.360 through sends a signal to the board
00:07:24.960 00:07:24.970 which then tells the motor on the
00:07:27.570 00:07:27.580 diverter valve to open the diverter so
00:07:31.260 00:07:31.270 the hot water being heated up flows
00:07:33.600 00:07:33.610 through the plate heat exchanger your
00:07:36.600 00:07:36.610 fresh water is passing through the other
00:07:39.210 00:07:39.220 side of that plate heat exchanger and
00:07:41.100 00:07:41.110 gets heated up through the place
00:07:50.280 00:07:50.290 to clarify the hot water sequence is the
00:07:53.700 00:07:53.710 same as the central heating the fan the
00:07:56.730 00:07:56.740 pump will run the gas valve will open
00:07:58.260 00:07:58.270 etc but because the flow sensor has been
00:08:01.680 00:08:01.690 triggered the diverter and motor will
00:08:05.430 00:08:05.440 move into the hot water position sending
00:08:08.730 00:08:08.740 the heated up water instead of down the
00:08:11.190 00:08:11.200 radiators but down the plate heat
00:08:13.740 00:08:13.750 exchanger and then your hot water will
00:08:16.290 00:08:16.300 get hot from there combi boilers can
00:08:18.690 00:08:18.700 only do one at a time and it always
00:08:21.270 00:08:21.280 prioritize the hot water so if you open
00:08:23.400 00:08:23.410 a hot tap your central heating will stop
00:08:26.130 00:08:26.140 but you probably won't even realize
00:08:28.740 00:08:28.750 because the radiators will be hot anyway
00:08:38.120 00:08:38.130 00:08:56.690 00:08:56.700 here's a heat only boiler same again
00:08:59.860 00:08:59.870 once you have a demand the fan will run
00:09:02.810 00:09:02.820 once it's proved it tells the gas valve
00:09:05.030 00:09:05.040 and the spark to begin you can see here
00:09:08.420 00:09:08.430 the air intake as well who mixes a
00:09:10.850 00:09:10.860 perfect amount of air and gas so it can
00:09:14.240 00:09:14.250 burn correctly
00:09:38.720 00:09:38.730 gonna finish up with a couple of calm
00:09:40.610 00:09:40.620 B's he's the newest style then there's
00:09:42.920 00:09:42.930 an older style as well so you can see
00:09:44.630 00:09:44.640 the layouts on the oldest style it's
00:09:47.360 00:09:47.370 quite a few micro switches on those
00:09:49.670 00:09:49.680 micro switches behind him or the Hydra
00:09:52.160 00:09:52.170 blocks or the diverter valves and he
00:09:54.920 00:09:54.930 knows our diaphragms and plates with
00:09:58.130 00:09:58.140 pins on them so those plates and
00:10:00.560 00:10:00.570 diaphragms get moved and they pushed a
00:10:03.320 00:10:03.330 switch with a micro switch in them so
00:10:05.660 00:10:05.670 then that activates the central heating
00:10:07.520 00:10:07.530 or the hot water
00:10:19.620 00:10:19.630 00:10:32.370 00:10:32.380 you add me on social media on Instagram
00:10:35.040 00:10:35.050 or Twitter then you can find some
00:10:37.250 00:10:37.260 competitions promotions and some
00:10:40.230 00:10:40.240 plumbing disasters as well
00:10:45.730 00:10:45.740 that does it for this video thanks for
00:10:47.889 00:10:47.899 watching
00:10:54.390 00:10:54.400
Office location
Engineering company LOTUS®
Russia, Ekaterinburg, Lunacharskogo street, 240/12

Phone: +7 343 216 77 75

E-mail: info@lotus1.ru

Sales phone

Russia: +7 343 216 77 75

WhatsApp: +79122710308