/ News & Press / Video / Heat Exchangers - Liebherr-Aerospace Saline, Inc.
Heat Exchangers - Liebherr-Aerospace Saline, Inc.
WEBVTT Kind: captions Language: en
00:00:12.667 --> 00:00:15.501 When we were in the planning stages of this Heat Exchanger Facility 00:00:15.501 --> 00:00:20.000 we did our research to figure out what the best solutions were in the industry for each process. 00:00:20.000 --> 00:00:23.209 By combining all of these best practices, and designing our own solutions 00:00:23.209 --> 00:00:26.959 where no good solution currently existed, we developed a facility that is state of the art. 00:00:26.959 --> 00:00:31.918 We have the on-hand inventory for an outright sale or an advance exchange if needed. 00:00:31.918 --> 00:00:36.751 And, our facility works per the OEM CMM and only uses original parts – 00:00:36.751 --> 00:00:40.751 eliminating DER or PMA approval required by the customer. 00:00:40.751 --> 00:00:46.000 Our Heat Transfer facility can do all of this at market pricing with superior performance. 00:00:46.000 --> 00:00:51.125 The incoming/receiving section is where our techs can assess the unit and the customer needs. 00:00:51.125 --> 00:00:55.292 We can then start the paperwork and document our initial findings on the unit. 00:00:55.292 --> 00:00:58.918 Our chemical processing platform was built with the future in mind. 00:00:58.918 --> 00:01:02.918 Our 16 fully-automated 600-gallon chemical and rinse tanks 00:01:02.918 --> 00:01:07.999 have built in filtration, agitation and ORP adjustments. 00:01:07.999 --> 00:01:10.209 They are user friendly and efficient. 00:01:10.209 --> 00:01:14.626 We also utilize 2 tanks to perform our underwater proof pressure tests. 00:01:14.626 --> 00:01:17.292 To make sure our units meet the highest standards, 00:01:17.292 --> 00:01:20.751 our final test setup is designed to accurately read flows 00:01:20.751 --> 00:01:24.918 and pressures of a unit to ensure a long lasting, quality product. 00:01:24.918 --> 00:01:28.375 Our machine shop is utilized for both the disassembly of products before repair 00:01:28.375 --> 00:01:31.000 as well as the final machining before release to service. 00:01:31.000 --> 00:01:34.334 To speed up our capability development we decided to purchase a 3D printer 00:01:34.334 --> 00:01:38.000 primarily for the development of V-band clamps for low pressure applications. 00:01:38.000 --> 00:01:41.250 It didn’t take long for us to figure out that there were many more ways to utilize this printer, 00:01:41.250 --> 00:01:43.626 and have since printed cradles for parts during welding, 00:01:43.626 --> 00:01:45.792 adapters for internal varnish application 00:01:45.792 --> 00:01:47.876 and supports for testing instruments. 00:01:47.876 --> 00:01:51.667 Through the use of CMT robotic welding and non-contact dimensional verification, 00:01:51.667 --> 00:01:53.834 and the best manual TIG welders in the industry, 00:01:53.834 --> 00:01:57.000 we’re able to produce the best finished product you will find in this market. 00:01:57.000 --> 00:02:01.000 After welding and dimensional verification, every unit undergoes dye- penetrant inspection 00:02:01.000 --> 00:02:04.292 to verify the weld quality is compliant with the OEM established criteria. 00:02:04.292 --> 00:02:08.792 Making sure our community stays safe, we built a Waste Water Treatment Plant 00:02:08.792 --> 00:02:12.626 to remove heavy metals and chemicals from our waste stream. 00:02:12.626 --> 00:02:19.125 This system also allows us to be more self-sufficient which cuts down on costs for our customers. 00:02:19.125 --> 00:02:21.959 Our facility employs skilled people using the latest technologies 00:02:21.959 --> 00:02:26.417 to ensure a cost-effective, quality product gets to our customer on time.
Office location
Engineering company LOTUS®
Russia, Ekaterinburg, Lunacharskogo street, 240/12