Heat Exchanger Retubing - Curran International - 3D Oil & Gas Animation

WEBVTT
Kind: captions
Language: en

00:00:00.740
refinery and petrochemical industrial
00:00:03.230 00:00:03.240 complexes have a wide range of fixed
00:00:05.360 00:00:05.370 equipment to process hydrocarbons safe
00:00:07.849 00:00:07.859 operation requires constant management
00:00:09.740 00:00:09.750 of equipment fitness for service then
00:00:15.589 00:00:15.599 fan and shell-and-tube exchangers are
00:00:17.660 00:00:17.670 inspected for integrity using a variety
00:00:19.700 00:00:19.710 of methods and discovery of corrosion
00:00:21.980 00:00:21.990 tube fitting stress cracking localized
00:00:24.859 00:00:24.869 erosion as examples may result in
00:00:27.320 00:00:27.330 equipment repair or replacement
00:00:28.790 00:00:28.800 depending on the severity of the
00:00:30.589 00:00:30.599 condition what if there was a reliable
00:00:32.510 00:00:32.520 alternative to retube or replacement
00:00:34.780 00:00:34.790 perhaps even a way to alloy up at a
00:00:37.280 00:00:37.290 fraction of the cost
00:00:38.360 00:00:38.370 let Curran use your existing tubes then
00:00:41.209 00:00:41.219 install a liner alloy of your choice
00:00:42.950 00:00:42.960 without the need to move the exchanger
00:00:45.110 00:00:45.120 or fin fan from its place in the unit
00:00:49.569 00:00:49.579 the installation of a full-length liner
00:00:52.130 00:00:52.140 or a tube and insert to repair and in
00:00:54.740 00:00:54.750 service to can restore years of
00:00:56.689 00:00:56.699 operating integrity to the exchanger and
00:00:58.790 00:00:58.800 is a proven reliable maintenance
00:01:00.920 00:01:00.930 practice current international will
00:01:03.590 00:01:03.600 consult with the client to review the
00:01:05.359 00:01:05.369 existing operating conditions and
00:01:07.070 00:01:07.080 confirm dimensions of the existing
00:01:09.320 00:01:09.330 exchanger evaluate repair liner alloy
00:01:12.080 00:01:12.090 options then expertly install and
00:01:14.780 00:01:14.790 hydraulically expand partial and full
00:01:16.640 00:01:16.650 length repair life
00:01:20.520 00:01:20.530 an important first step is cleaning the
00:01:22.890 00:01:22.900 existing tube of scale oxides and foul
00:01:25.920 00:01:25.930 it as a result of the operating service
00:01:28.700 00:01:28.710 the tube must be clean and clear of
00:01:31.289 00:01:31.299 debris so that maximum clearances are
00:01:33.420 00:01:33.430 achieved for tube partial insert
00:01:36.120 00:01:36.130 installation hand tool cleaning at the
00:01:38.310 00:01:38.320 tube end is adequate surface breath
00:01:42.100 00:01:42.110 current international offers grit blast
00:01:44.780 00:01:44.790 to buy decline which achieves near white
00:01:47.270 00:01:47.280 metal cleanliness as a turnkey service
00:01:50.030 00:01:50.040 it maximizes intimate contact of the
00:01:52.219 00:01:52.229 repair liner to the existing - - mint
00:01:56.330 00:01:56.340 inserts are a common repair strategy for
00:01:58.429 00:01:58.439 exchangers they can be mechanically
00:02:00.649 00:02:00.659 rolled at both ends or hydraulically
00:02:02.510 00:02:02.520 expand it and then mechanically rolled
00:02:04.460 00:02:04.470 at both ends full length liners however
00:02:08.419 00:02:08.429 are a tube end - - bad repair strategy
00:02:11.240 00:02:11.250 her fin fan exchangers technicians
00:02:13.699 00:02:13.709 working off existing decade install
00:02:15.830 00:02:15.840 lines down the already cleaned
00:02:17.360 00:02:17.370 full-length tube IDs
00:02:22.040 00:02:22.050 the loosely installed tube will be
00:02:24.140 00:02:24.150 hydraulically expanded to a calibrated
00:02:26.450 00:02:26.460 pressure based off the lighter material
00:02:27.950 00:02:27.960 chosen this will close the annulus
00:02:30.410 00:02:30.420 between the liner and parent tube with
00:02:33.770 00:02:33.780 the hydraulic pump now calibrated
00:02:35.540 00:02:35.550 expansion tools are attached at both
00:02:37.550 00:02:37.560 ends tube Tech's fill the liner at the
00:02:42.440 00:02:42.450 set pressure and ramp up rate to expand
00:02:45.020 00:02:45.030 the liner
00:02:48.270 00:02:48.280 once the line reaches a designed
00:02:50.160 00:02:50.170 expansion dimension the hydrostatic
00:02:52.530 00:02:52.540 pressure is immediately released when
00:02:54.510 00:02:54.520 the bleeder valve is opened all the
00:02:56.220 00:02:56.230 installed liners shall be expanded
00:02:58.350 00:02:58.360 full-length liners are cut to the
00:03:00.000 00:03:00.010 existing tube ends and finished to a
00:03:02.250 00:03:02.260 measured projection for some alloys like
00:03:04.860 00:03:04.870 stainless steel it is recommended that
00:03:07.050 00:03:07.060 tube ends be roller expanded the process
00:03:09.809 00:03:09.819 can be duplicated for shell and tube
00:03:11.550 00:03:11.560 exchangers the clearance required is a
00:03:13.890 00:03:13.900 liner marginally longer than the length
00:03:15.660 00:03:15.670 of the existing two Curran has field
00:03:18.960 00:03:18.970 work experience at refinery clients
00:03:21.120 00:03:21.130 throughout the globe we can be your
00:03:23.040 00:03:23.050 turnkey contractor her grip last tube
00:03:25.530 00:03:25.540 cleaning and liner installation
Office location
Engineering company LOTUS®
Russia, Ekaterinburg, Lunacharskogo street, 240/12

Phone: +7 343 216 77 75

E-mail: info@lotus1.ru

Sales phone

Russia: +7 343 216 77 75

WhatsApp: +79122710308