/ News & Press / Video / Heat Exchanger Tube Bundle Extraction Process
Heat Exchanger Tube Bundle Extraction Process
WEBVTT Kind: captions Language: en
00:00:20.430 we are now inside a refining plans and 00:00:24.39000:00:24.400 we have to pull out to tube bundles 00:00:27.24000:00:27.250 weighing 24 tons diameter one thousand 00:00:31.97900:00:31.989 eight hundred and fifty millimeter ice 00:00:34.50000:00:34.510 about 20 meter from the ground 00:00:48.33000:00:48.340 you 00:01:05.60000:01:05.610 while our operator makes a routine check 00:01:09.35000:01:09.360 of the machine diesel and oil levels but 00:01:13.28000:01:13.290 personnel has already prepared the tools 00:01:15.98000:01:15.990 accessories necessary I bolts balance 00:01:19.76000:01:19.770 and keval near the heat exchanger 00:01:38.84000:01:38.850 [Music] 00:01:46.74000:01:46.75000:02:17.57000:02:17.58000:02:25.24000:02:25.25000:02:42.16000:02:42.170 bringing the traction carriage we pull 00:02:45.04000:02:45.050 out of the tube bundle for about Swan 00:02:47.77000:02:47.780 1.2 meter so as to leave the space 00:02:51.04000:02:51.050 necessary for the hydraulic support 00:02:53.74000:02:53.750 carriages 00:03:15.45000:03:15.46000:03:53.80000:03:53.810 we pass on to the hooking up and 00:03:56.83900:03:56.849 hoisting of the tip sheet with the 00:03:59.42000:03:59.430 extraction carriage and we completely 00:04:01.88000:04:01.890 extraction being careful to distribute 00:04:04.46000:04:04.470 the weight of the bundle on the carriage 00:04:06.58900:04:06.599 and on the support carriages 00:04:10.68000:04:10.69000:04:22.76000:04:22.77000:04:48.56000:04:48.570 once the weight of the puller is 00:04:50.91000:04:50.920 balanced we completely release the cable 00:04:54.06000:04:54.070 that is trying it to the heat exchangers 00:04:56.40000:04:56.410 shell and we strive to do the sentence 00:04:58.83000:04:58.840 with a crane 00:05:07.95900:05:07.96900:05:21.61000:05:21.620 once it reached the ground the tube 00:05:24.70000:05:24.710 bundle is removed from the structure and 00:05:27.31000:05:27.320 it is ready for the maintenance 00:05:29.08000:05:29.090 operations 00:05:31.87000:05:31.88000:05:54.23000:05:54.240 when the maintenance phase has been 00:05:56.70000:05:56.710 completed the to bundle is loaded again 00:05:59.93900:05:59.949 onto the established and ring pushed all 00:06:02.36900:06:02.379 the way back also in this case is the 00:06:06.39000:06:06.400 way to the bundle distributed over the 00:06:08.79000:06:08.800 various support carriers and on the main 00:06:10.92000:06:10.930 carriage the okay is given to the crane 00:06:13.89000:06:13.900 for the hoisting phase only after having 00:06:16.89000:06:16.900 accurately balanced the machine with the 00:06:19.49900:06:19.509 bundle when it is in position we align 00:06:23.30900:06:23.319 the puller to the heat exchanger attach 00:06:27.74900:06:27.759 the safety cable that was previously 00:06:30.26900:06:30.279 placed on the flange on the shell side 00:06:32.08900:06:32.099 to the side hydraulic cylinders and we 00:06:35.70000:06:35.710 complete the Anchorage to the heat 00:06:37.37900:06:37.389 exchanger 00:06:48.38000:06:48.39000:06:55.23900:06:55.249 in the delicate inserting maneuver 00:06:58.10900:06:58.119 during which the independent movement of 00:07:01.11900:07:01.129 the hydraulically controlled supports or 00:07:03.78900:07:03.799 the hoisting carriages is fundamental 00:07:06.33900:07:06.349 for the gauge and rapid success of the 00:07:08.58900:07:08.599 operation 00:07:18.78000:07:18.79000:07:27.15900:07:27.16900:07:45.98000:07:45.990 having extracted the stripes the 00:07:49.20000:07:49.210 insertion is completed with a sheet 00:07:51.63000:07:51.640 coming to entirely touch the gaskets 00:08:06.20000:08:06.21000:08:19.08000:08:19.09000:08:19.36000:08:19.37000:08:22.37000:08:22.380
Office location
Engineering company LOTUS®
Russia, Ekaterinburg, Lunacharskogo street, 240/12