Natural gas well completion in the Marcellus Shale
WEBVTT Kind: captions Language: en
00:00:07.160 completion happens after the wellbore 00:00:09.34000:00:09.350 has been drilled this is where we 00:00:11.28900:00:11.299 optimize a well for maximum flow of 00:00:13.42000:00:13.430 natural gas completion begins with a 00:00:15.91000:00:15.920 process called hydraulic fracturing or 00:00:18.01000:00:18.020 fracking for short fracking is a process 00:00:20.76900:00:20.779 to stimulate natural gas production from 00:00:23.10900:00:23.119 the tight shale formation below the area 00:00:26.25900:00:26.269 is being fracked in the Marcellus shale 00:00:28.06000:00:28.070 reservoir located several thousand feet 00:00:30.22000:00:30.230 below any groundwater sources 00:00:32.22900:00:32.239 isolated by millions of tons of 00:00:34.54000:00:34.550 impenetrable layers of rock and the 00:00:36.52000:00:36.530 wellbore cemented in casing before 00:00:38.82900:00:38.839 fracking we test the KC's integrity one 00:00:41.44000:00:41.450 more time and prepare the site by 00:00:43.42000:00:43.430 leveling it on every frack site 00:00:45.76000:00:45.770 Chesapeake constructs multiple layers of 00:00:48.63000:00:48.640 containment to include placing all 00:00:51.31000:00:51.320 equipment on secondary containment in 00:00:53.38000:00:53.390 addition the entire location is 00:00:55.99000:00:56.000 surrounded by a three-foot earth berm 00:00:58.50000:00:58.510 when the site's graded in prep the 00:01:01.06000:01:01.070 completion equipment moves in the entire 00:01:03.43000:01:03.440 frack job usually lasts several days 00:01:05.60900:01:05.619 water is transferred to location from 00:01:08.92000:01:08.930 storage areas we call impoundment it is 00:01:11.94900:01:11.959 pumped in this black thick continuous 00:01:14.63900:01:14.649 pre-tested pipe to the location as the 00:01:18.46000:01:18.470 frack begins water from the steel tanks 00:01:20.68000:01:20.690 feeds into a blender which mixes it with 00:01:22.83900:01:22.849 a small amount of chemical additives 00:01:24.63900:01:24.649 used in fracking the mixture is 00:01:26.65000:01:26.660 transferred to pump trucks which will 00:01:28.21000:01:28.220 send pressurized fluids through a 00:01:29.68000:01:29.690 manifold and deep down hole by way of a 00:01:32.02000:01:32.030 pressure control device feeding into the 00:01:34.35900:01:34.369 well called a frack stack on top of the 00:01:36.66900:01:36.679 wellhead once the initial fractures are 00:01:39.16000:01:39.170 created in the shale proppant or sand is 00:01:42.10000:01:42.110 added to open the shale even more and to 00:01:44.32000:01:44.330 hold those cracks open allowing the gas 00:01:46.41900:01:46.429 or fluid to escape Chesapeake takes your 00:01:50.08000:01:50.090 safety and preserving the environment 00:01:51.37000:01:51.380 very seriously so let's talk about 00:01:54.07000:01:54.080 what's in the fluid being pumped down 00:01:55.93000:01:55.940 hole frack fluid is actually more than 00:01:59.26000:01:59.270 99% sand and water the rest are what we 00:02:02.41000:02:02.420 call special-purpose additives which do 00:02:04.41900:02:04.429 things like kill bacteria prevent 00:02:06.49000:02:06.500 corrosion and stop scale deposits from 00:02:08.71000:02:08.720 forming in the pipe additives are mixed 00:02:11.19900:02:11.209 in self-contained systems and are not 00:02:12.97000:02:12.980 exposed to the surface environment each 00:02:15.76000:02:15.770 additive is designed to perform a 00:02:17.65000:02:17.660 specific down hole function 00:02:19.68000:02:19.690 should not return any appreciable amount 00:02:21.63000:02:21.640 of chemical to the surface with the 00:02:23.43000:02:23.440 produced water the entire fracturing 00:02:26.07000:02:26.080 process for a single well occurs over 00:02:28.29000:02:28.300 several days and in many stages here at 00:02:30.99000:02:31.000 Chesapeake we use composite frack plugs 00:02:33.06000:02:33.070 like this to isolate underground zones 00:02:35.79000:02:35.800 while we frack this gives us a very 00:02:38.67000:02:38.680 fine-tuned control of pressure and 00:02:41.13000:02:41.140 fracturing patterns after our frack job 00:02:44.76000:02:44.770 we bring in a piece of equipment called 00:02:46.62000:02:46.630 a service rig or work over rig and 00:02:48.66000:02:48.670 remove the frac stack from the well this 00:02:51.42000:02:51.430 service rig also removes the frac plugs 00:02:53.49000:02:53.500 used to isolate stages in the zone 00:02:55.53000:02:55.540 during the Frank process once the plugs 00:02:57.99000:02:58.000 have been removed this will allow all of 00:02:59.61000:02:59.620 the stages to contribute to the amount 00:03:01.35000:03:01.360 of gas entering the wellbore next the 00:03:04.35000:03:04.360 work over rig runs production tubing 00:03:06.06000:03:06.070 which transports the gas to the top this 00:03:08.46000:03:08.470 small diameter steel pipe provides a 00:03:10.83000:03:10.840 vehicle for the gas to travel from the 00:03:12.60000:03:12.610 production zone to the wellhead a cross 00:03:15.45000:03:15.460 section of the completed well above the 00:03:17.28000:03:17.290 production zone shows the many 00:03:18.87000:03:18.880 protective layers Cement conductor 00:03:21.42000:03:21.430 casing cement surface casing drilling 00:03:24.69000:03:24.700 mud and cement production casing and 00:03:26.72900:03:26.739 then production tubing through which the 00:03:28.62000:03:28.630 produced gas and water will flow a 00:03:30.60000:03:30.610 minimum of seven layers of protection 00:03:33.42000:03:33.430 finally we install the top part of the 00:03:35.64000:03:35.650 wellhead what we call the Christmas tree 00:03:37.38000:03:37.390 this equipment gets its name from the 00:03:39.51000:03:39.520 way the valves are arranged on the tree 00:03:41.19000:03:41.200 they can all look a little different but 00:03:43.22900:03:43.239 they have one basic function controlling 00:03:45.36000:03:45.370 the natural gas flow to the surface the 00:03:48.50900:03:48.519 top of our casing ends here on what we 00:03:50.34000:03:50.350 call the B section of the wellhead on 00:03:52.44000:03:52.450 top of the B sections is a series of 00:03:54.44900:03:54.459 valves used to regulate and control the 00:03:56.88000:03:56.890 flow of gas on surface we have the 00:03:58.92000:03:58.930 bottom master valve a middle master 00:04:00.96000:04:00.970 valve and a wing valve in addition to 00:04:03.24000:04:03.250 the wing valve we have a safety valve 00:04:04.94900:04:04.959 which can be shed in either manually 00:04:07.02000:04:07.030 on-site or remotely by computer 00:04:09.39000:04:09.400 activated controls the well initially 00:04:12.39000:04:12.400 brings up produced brine from the 00:04:14.22000:04:14.230 fracking procedure the fluid along with 00:04:16.89000:04:16.900 naturally occurring water is piped to 00:04:18.96000:04:18.970 steel tank sealed off by double 00:04:20.84900:04:20.859 containment it's later filtered and 00:04:23.07000:04:23.080 recycled in fact we reuse nearly 100% of 00:04:27.00000:04:27.010 these produced fluids in the next frack 00:04:28.52900:04:28.539 job we'll tell you more in a while about 00:04:30.75000:04:30.760 Chesapeake's innovative water reuse tech 00:04:33.09000:04:33.100 they continue to reduce the water needs 00:04:35.49000:04:35.500 associated with the completion of these 00:04:37.47000:04:37.480 deep Shale wells this wheel head can be 00:04:40.59000:04:40.600 used for years even decades as we move 00:04:42.96000:04:42.970 into the next phase called production 00:04:44.91000:04:44.920 this phase is where the gas moves from 00:04:46.98000:04:46.990 the wellhead to processing or purifying 00:04:49.44000:04:49.450 and onto the sales pipeline
Office location
Engineering company LOTUS®
Russia, Ekaterinburg, Lunacharskogo street, 240/12