00:00:07.519 natural gas provides 1/3 of all the 00:00:10.45900:00:10.469 energy consumed in the UK it is used by 00:00:14.36000:00:14.370 industry for cooking and heating in 00:00:16.82000:00:16.830 homes and by power stations for the 00:00:19.16000:00:19.170 generation of electricity currently half 00:00:24.08000:00:24.090 that gas has to be imported and forecast 00:00:26.83900:00:26.849 suggests that figure will rise to more 00:00:29.12000:00:29.130 than 60 percent by 2025 one domestic 00:00:33.65000:00:33.660 option is shale gas and oil deposits are 00:00:37.10000:00:37.110 known to exist in the north of England 00:00:38.95900:00:38.969 the Weald basin in Sussex and Surrey and 00:00:41.60000:00:41.610 the southwest and the central belt of 00:00:44.27000:00:44.280 Scotland shale gas and oil occur 00:00:47.81000:00:47.820 naturally in a layer of impermeable rock 00:00:50.18000:00:50.190 around a mile underground extracting the 00:00:53.72000:00:53.730 gas and oil involves a four stage 00:00:55.81900:00:55.829 process and at every stage potential 00:00:59.00000:00:59.010 operators must get consents from 00:01:01.06900:01:01.079 independent regulators and public 00:01:03.18900:01:03.199 consultation must take place potential 00:01:06.80000:01:06.810 operators in the UK are currently at the 00:01:09.14000:01:09.150 first stage exploration once companies 00:01:12.62000:01:12.630 have consent they are allowed to explore 00:01:14.96000:01:14.970 supplies at approved sites to find out 00:01:17.66000:01:17.670 how much gas and oil could be extracted 00:01:19.96900:01:19.979 commercially a typical exploration site 00:01:23.03000:01:23.040 starts with construction of a well pad 00:01:25.24900:01:25.259 it may contain Porter cabins for staff 00:01:28.24900:01:28.259 living quarters and offices water and 00:01:30.83000:01:30.840 waste storage and processing facilities 00:01:33.60900:01:33.619 during drilling there will also be a 00:01:36.20000:01:36.210 drilling rig the entire site is around 00:01:39.26000:01:39.270 one to two hectares the size of one to 00:01:41.84000:01:41.850 two football pitches operators use the 00:01:44.96000:01:44.970 process of hydraulic fracturing also 00:01:46.99900:01:47.009 known as fracking to help the extraction 00:01:49.78900:01:49.799 of the gas and oil supplies deep 00:01:51.49900:01:51.509 underground otherwise operations are 00:01:54.74000:01:54.750 similar to other onshore oil and gas 00:01:56.84000:01:56.850 extraction or fracking is a nickname a 00:02:00.26000:02:00.270 shortened name for hydraulic fracturing 00:02:02.98000:02:02.990 what you basically do is drill a hole 00:02:05.17000:02:05.180 into the shale vertical for a while 00:02:07.92900:02:07.939 going down and then it becomes 00:02:09.30900:02:09.319 horizontal far below the surface and you 00:02:16.15000:02:16.160 pump high-pressure fluid a mixture of 00:02:18.69900:02:18.709 water and some chemicals into the shale 00:02:21.37000:02:21.380 cracking the rock these fractures are 00:02:26.25900:02:26.269 opened up by the high pressure and what 00:02:28.83900:02:28.849 you do is you put tiny particles usually 00:02:31.03000:02:31.040 send in these holes or these cracks and 00:02:34.66000:02:34.670 that's known as proppant and that sand 00:02:37.53900:02:37.549 keeps the cracks open so a gas flows out 00:02:40.87000:02:40.880 of the cracks into the into the well but 00:02:44.11000:02:44.120 of course what first comes out isn't 00:02:46.00000:02:46.010 generally gas its the fluid that you've 00:02:48.82000:02:48.830 pumped down the well then the the gas 00:02:51.55000:02:51.560 starts coming out if exploration is 00:02:55.24000:02:55.250 successful operators can then apply to 00:02:57.67000:02:57.680 begin the pre-production stage during 00:03:00.37000:03:00.380 pre-production more wells will be 00:03:02.62000:03:02.630 drilled on the same site and more 00:03:04.75000:03:04.760 equipment water and chemicals 00:03:06.88000:03:06.890 transferred to and from the site 00:03:09.50900:03:09.519 operators then apply for the next stage 00:03:12.42000:03:12.430 production during this stage the oil is 00:03:16.21000:03:16.220 sent to a refinery and the gas can be 00:03:18.46000:03:18.470 connected to pipelines or tank it away 00:03:21.21000:03:21.220 the final stage of the process is 00:03:23.89000:03:23.900 decommissioning operators make the wells 00:03:26.89000:03:26.900 safe for abandonment and must restore 00:03:29.59000:03:29.600 the site to its original condition 00:03:34.76000:03:34.770 you
Office location
Engineering company LOTUS®
Russia, Ekaterinburg, Lunacharskogo street, 240/12